Full turbine cleaning
Blades, hub, tower and nacelle in a single intervention, in one day per machine, with nobody climbing the turbine.
We clean and inspect complete wind turbines using drones operated from the ground. One day per machine instead of the four or five that rope access takes, and the whole crew stays on the ground.
The problem
Rope access. A certified technician climbs to the nacelle, abseils down the blade or the tower and works the surface section by section. A full clean takes four to five days per machine.
The turbine is down for most of that week. That is why cleaning stops behaving like routine maintenance and starts behaving like a capital decision, and gets pushed to next year.
| Item | Rope access | Drone, from the ground |
|---|---|---|
| Duration | 4-5 days per machine | 1 day per machine |
| Access | Abseiling from the nacelle | From the ground |
| Personnel at height | Yes | None |
| Rigging | Required | Not required |
Services
Blades, hub, tower and nacelle in a single intervention, or each scope on its own. Visual inspection is built into the cleaning flight: every machine is handed over with before and after photographic evidence.
Blades, hub, tower and nacelle in a single intervention, in one day per machine, with nobody climbing the turbine.
The most exposed surface on the machine, cleaned from the ground and without abseiling.
The complete shaft, with nobody working down the outside of the machine.
The highest point on the machine, cleaned without anyone having to reach it.
Document the real condition of the fleet before deciding where to intervene.
The result
Field proof
Eolinet delivered and invoiced a full cleaning campaign at a Spanish wind farm for a major Iberian utility. After the operational validation, that same client placed an order for a second site in under three months.
Getting there meant clearing the utility contractor prequalification process first: health and safety, insurance, audits and individual documentation for every pilot. That process is what keeps most drone operators out of these sites, and it is behind us.
We do not publish the name of the client or of the wind farms where we have worked.
How it works
Service activation takes around three weeks from confirmed order, and what fills that time is the aviation permit process. We handle it.
Context
Spain closed 2024 with 22.486 wind turbines across 1.416 wind farms and 31.679 MW of installed capacity, according to the 2025 yearbook of the Spanish Wind Energy Association (AEE).
A significant share of that fleet has gone years without a proper clean. Not because nobody cares, but because with rope access the numbers do not work.
Anuario Eólico 2025, Asociación Empresarial Eólica (year-end 2024 figures)
Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.