Full turbine cleaning
Blades, hub, tower and nacelle in a single intervention, in one day per machine, with nobody climbing the turbine.
Document the real condition of the fleet before deciding where to intervene.
Before deciding which machines need cleaning, or simply to record the condition of a site on a given date, most O&M teams want a visual inspection that does not require rigging ropes.
Eolinet inspects blades, tower and nacelle by drone, from the ground, to the same safety standard as every other service. The deliverable is a photographic report per turbine, usable to prioritise interventions across a fleet.
It is a visual inspection with photographic evidence. It shows surface condition, accumulated soiling and staining. A certified structural assessment needs a wider scope, and that is agreed before the campaign rather than after it.
There is no single published manufacturer figure setting how often to inspect. Industry practice converges on at least one visual review per year, more often at coastal sites or where exposure to dust and salinity is high. Every site has its own logic, which is why we prefer to start from your fleet data before proposing a cadence.
The most common combination is inspecting and cleaning in the same campaign. In cleaning work the visual inspection is built into the flight, so booking inspection separately makes sense mainly when documenting is the whole objective.
It is a visual inspection with photographic evidence. A certified structural assessment requires a wider scope, defined before the campaign.
Yes, and that is the most common arrangement. In cleaning services the visual inspection is included in the flight.
There is no single official figure. Industry practice is at least one visual review per year, and more frequently at coastal sites or where exposure to dust and salinity is high.
Blades, hub, tower and nacelle in a single intervention, in one day per machine, with nobody climbing the turbine.
The most exposed surface on the machine, cleaned from the ground and without abseiling.
The complete shaft, with nobody working down the outside of the machine.
Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.