Wind turbine cleaning services by drone
Blades, hub, tower and nacelle in a single intervention, in one day per machine, with nobody climbing the turbine.
Five scopes, one method: drones flown from the ground by accredited pilots, with nobody climbing the machine. Every service includes aviation permit handling and public liability cover for the operation.
Blades, hub, tower and nacelle in a single intervention, in one day per machine, with nobody climbing the turbine.
The most exposed surface on the machine, cleaned from the ground and without abseiling.
The complete shaft, with nobody working down the outside of the machine.
The highest point on the machine, cleaned without anyone having to reach it.
Document the real condition of the fleet before deciding where to intervene.
Most clients book the full scope, because paying for mobilisation once beats paying for it three times. Each service can still be booked on its own, and many sites do exactly that when part of the machine is already covered elsewhere.
Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.