Cleaning subcontractor for O&M providers

You hold the site relationship and the availability commitment. We deliver the cleaning without bringing work at height onto your site or taking the machine out for a week.

Why subcontract this rather than build it

Building a drone cleaning capability is not buying a drone. It is the adapted platform, the accredited pilots, the file for each of them, recurring aviation filings and public liability cover for the activity. And then keeping all of it live even though it is used a few weeks a year.

For a maintenance provider focused on availability and corrective work, the numbers rarely add up. Subcontracting the scope to someone who already has it built does.

How we fit into your contract

You keep the site relationship and the point of contact does not change. We come in as your subcontractor, with our documentation under your prequalification, and deliver whatever scope you assign.

We do not compete with your O&M. We do not touch internal components, we do not access the nacelle, and we do not pitch services to your end client on our own account.

Flexible scope

You can contract the full scope or just part of it. Some providers book towers only, because blade cleaning is already covered another way. It is quoted the same, with the site data.

What we hand you for your client

Before and after photographic reporting for every machine cleaned, in a format you can pass straight to your client as evidence of the work. Included in the service.

Two Eolinet technicians walking beside a wind turbine tower
Duration
1 working day per turbine
Personnel at height
None
Minimum order
4 turbines per campaign
Activation from order
~3 weeks
Maximum nacelle height
100 m
Aviation permits and liability cover
Included
Deliverable
Before and after photographic evidence, per machine

Request a quote

Frequently asked questions

Will you try to sell directly to our client?

No. If we come in as your subcontractor, the site’s point of contact is you.

Do you provide your own health, safety and insurance documentation?

Yes: prevention plan, risk assessment for the activity, public liability cover and an individual file for every pilot, ready to upload to whatever coordination platform you use.

Can you deliver a single scope, towers only for instance?

Yes, and it is common. Each scope (blades and hub, tower, nacelle) is contracted and quoted separately.

Tell us about your site and we will send you a quote

Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.