Eolinet Renovables: facts and figures
Everything quantifiable on this site, on one page, with the source for each figure. If a number is not here, it is because we have not verified it and we do not publish it.
The service
- Time per turbine
- 1 working day
2026 rate card and field operations - Traditional method, for comparison
- 4-5 days per turbine
Field operations - People working at height
- 0
Nature of the service (ground operated RPAS) - Cost and lost production reduction
- 75-80 %
Verified value proposition against the traditional method - Maximum nacelle height
- 100 m
2026 rate card - Scopes available
- Full, blades and hub, tower, nacelle, inspection
2026 rate card
Conditions
- Minimum order
- 4 turbines per campaign
2026 rate card - Activation from confirmed order
- ~3 weeks
2026 rate card (aviation filing) - Aviation permits
- Handled by Eolinet
2026 rate card - Public liability cover
- Included in the service
2026 rate card - Technical resources
- Water, pressure equipment, compressors and degreasers
2026 rate card - Provided by the client
- Yaw and pitch in maintenance position, and preventive nacelle sealing
2026 rate card - Deliverable
- Before and after photographic evidence, per machine
Field operations - Date confirmation
- The week before, based on the forecast
Field operations
The company
- Registered name
- Eolinet Renovables, S.L.
- Tax ID
- ESB75885087
- Registered address
- Calle Manufactura 2, Local 4, 41927 Mairena del Aljarafe (Sevilla), Spain
- Activity
- Wind turbine cleaning and inspection with RPAS
- Shareholder
- Vida Sustainable Ventures (50 %), venture builder in energy and infrastructure
vidaventures.es - Accredited pilots
- 3
Certificates on file - Prequalification
- Prequalified contractor for a major Iberian utility
Contractor certificate - Coverage
- Spain, available for Portugal and Europe
- Contact
- Contact form
We do not publish email addresses, to keep the spam out
Market context
- Wind turbines installed in Spain
- 22,486
Anuario Eólico 2025, AEE (year-end 2024) - Wind farms in Spain
- 1,416
Anuario Eólico 2025, AEE (year-end 2024) - Installed wind capacity in Spain
- 31,679 MW
Anuario Eólico 2025, AEE (year-end 2024)
What we do not publish, and why: prices (quoted per turbine by scope and rotor diameter, on request); client and site names (confidentiality); percentage of production recovered by cleaning (figures circulate in the sector, none with a measurement we can verify at a specific Spanish site); and installed wind capacity by Spanish region (the public sources we checked do not reconcile with the national total in the 2025 yearbook, so we prefer to give none).
Tell us about your site and we will send you a quote
Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.