Press

What has been published about Eolinet, the company's press releases and how to reach us if you are preparing a piece.

Eolinet in the media

Press releases

Press kit

Photos from real jobs, logos, a service fact sheet and our press release, ready to use. Free to use in coverage of Eolinet, credited "Photo: Eolinet Renovables".

Download the full kit ZIP · 2.2 MB

Photos

Click a photo to download it at full size.

Industrial drone pressure-washing a blade, flown from the ground.
Industrial drone pressure-washing a blade, flown from the ground.
Cleaning the blade root and hub in flight.
Cleaning the blade root and hub in flight.
The drone cleaning the nacelle.
The drone cleaning the nacelle.
The drone next to the tower, fed by a hose from the ground.
The drone next to the tower, fed by a hose from the ground.
Hub and blade root after cleaning.
Hub and blade root after cleaning.
The drone and ground equipment before take-off.
The drone and ground equipment before take-off.
Eolinet team at the foot of a turbine.
Eolinet team at the foot of a turbine.
Pilot with the drone controller.
Pilot with the drone controller.

Key facts

Service
Cleaning and visual inspection of complete wind turbines (blades, hub, tower and nacelle) with drones flown from the ground
For
Major utilities and turbine manufacturers, already operating in Spain
Duration
1 working day per turbine, versus 4-5 days with rope access
Work at height
0 people
Savings
75-80 % lower cost and lost revenue
Reach
Nacelles up to 100 m, across Spain
Company
Eolinet Renovables, S.L. Mairena del Aljarafe (Seville, Spain). Founded in 2025 and backed by the venture builder Vida Sustainable Ventures

Spokesperson

Ignacio López Martín, co-founder

Ignacio López Martín is an industrial engineer and serial founder. He co-founded Cable Energía, acquired by Shell and later by Acciona. He chairs Capflex Energía, which develops and sells battery storage projects in Spain. Through Vida Sustainable Ventures, his venture builder in Seville, he has co-founded Eolinet Renovables and The Seafolk.

Available for interview. To request further material or an interview, use the contact form stating the outlet and the deadline.

By agreement with our clients we do not publish their names or those of the wind farms, in the press either.

Tell us about your site and we will send you a quote

Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.