Request a quote

Tell us about the site and we will send a fixed proposal per turbine and scope. We reply within two working days.

We do not publish email addresses on the site, to keep the spam out. This form goes straight to the person who prepares the quotes.

Three data points are enough to fix a price

  1. Number of turbines in the campaign
  2. Site location (province or coordinates)
  3. Rotor diameter of the machines

If you do not have the rotor diameter to hand, the model or rated power works just as well.

Contact details

Contact
The form on this page. It is the fastest route and the one we track best.
Response time
Two working days
Address
Calle Manufactura 2, Local 4
41927 Mairena del Aljarafe (Sevilla), Spain
Registered name
Eolinet Renovables, S.L.
Tax ID
ESB75885087

Supplier onboarding and prequalification

If you need us registered on your supplier platform or taken through a prequalification process, say so in the message. The file is ready: health and safety, insurance, pilot certificates and financial standing.