Wind turbine cleaning for manufacturers and service providers

If you maintain fleets for several owners under service agreements, cleaning is a scope you get asked for and do not always want to deliver with your own resources.

A scope that recurs in every contract

Cleaning shows up in service agreements again and again, but rarely with enough volume at a single site to justify owning the capability. The usual outcome is subcontracting to rope access, with the lead time and the exposure that carries at sites you do not control.

What we bring

A fixed scope per unit, deliverable in one working day per machine, with nobody at height and with permits and insurance inside the service. The same at any site in Spain, without you having to find a contractor region by region.

Scale is what makes this route interesting for both sides: for you, a single supplier; for us, aggregated volume instead of site by site.

Without interfering in your operation

The drone works from the ground. We do not access the nacelle, we do not touch components and we do not intervene in the control system: yaw and pitch are always handled by site personnel during the operation.

Prequalification

We have already cleared contractor prequalification for a major Iberian utility. The file (health and safety, insurance, financial standing and documentation for every pilot) is kept live and is submitted to your supplier onboarding without starting from zero.

Our HSE system and the documents we provide are set out in HSE and supplier qualification.

Eolinet pilots preparing the cleaning drone before the flight
Duration
1 working day per turbine
Personnel at height
None
Minimum order
4 turbines per campaign
Activation from order
~3 weeks
Maximum nacelle height
100 m
Aviation permits and liability cover
Included
Deliverable
Before and after photographic evidence, per machine

Request a quote

Frequently asked questions

Can you cover sites belonging to several different owners?

Yes. You are the point of contact; the owner of each site does not change maintenance provider.

Do you intervene on internal components?

No. The service is exterior cleaning and visual inspection. There is no nacelle access and no intervention on components.

Do you work outside Spain?

We operate in Spain. For campaigns in Portugal and the rest of Europe we assess case by case, because the administrative side changes by country.

Tell us about your site and we will send you a quote

Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.