Wind turbine cleaning in Andalusia

Full, blade, tower and nacelle cleaning with ground operated drones, at wind farms across Andalusia. One working day per machine, with nobody at height.

What drives a campaign in Andalusia

This is our home region. Eolinet is based in Mairena del Aljarafe, Seville, so mobilisation in Andalusia is short and campaigns fit into the calendar with more flexibility than elsewhere in Spain.

The Strait of Gibraltar and the Tarifa area hold some of the windiest sites in Europe, with strong sustained levante wind for much of the year. There the working window has to be hunted for, and planning with margin stops being a recommendation and becomes a requirement.

Soiling is mixed: inland dust across the Seville, Córdoba and Jaén countryside, and salt deposits at sites near the Cádiz and Almería coasts. Two different problems, solved by the same service but on different cadences.

Where we work

We cover wind farms across Cádiz, Seville, Málaga, Granada, Almería, Jaén, Córdoba and Huelva. The crew travels from Mairena del Aljarafe (Sevilla) with all technical resources: water, pressure equipment, compressors and degreasers.

Mobilisation and demobilisation are included from 4 turbines per campaign. If you manage several sites in the region, grouping them into a single campaign is what brings the cost down most.

Eolinet crew at an Andalusian wind farm
Duration
1 working day per turbine
Personnel at height
None
Minimum order
4 turbines per campaign
Activation from order
~3 weeks
Maximum nacelle height
100 m
Aviation permits and liability cover
Included
Deliverable
Before and after photographic evidence, per machine

Request a quote

Services available

Tower

The complete shaft, with nobody abseiling down it.

Nacelle

The outer housing, with nobody accessing it.

Frequently asked questions

Do you operate across Andalusia?

Yes. We cover Cádiz, Seville, Málaga, Granada, Almería, Jaén, Córdoba and Huelva. Crew mobilisation is included from 4 turbines per campaign.

How soon can you start?

Around 3 weeks from confirmed order, which is what the aviation filing takes. At sites with no aviation constraints it can be considerably less.

What do you need from the site on the day?

The turbine held in maintenance position, with yaw and pitch controlled by the site, and preventive sealing of the nacelle. Everything else is ours.

Tell us about your site and we will send you a quote

Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.