Wind turbine cleaning in Extremadura

Full, blade, tower and nacelle cleaning with ground operated drones, at wind farms across Extremadura. One working day per machine, with nobody at height.

What drives a campaign in Extremadura

Wind in Extremadura is relatively recent compared with northern Spain, which means a younger fleet and, generally, lighter first interventions than at sites carrying twenty years of operation.

The dehesa and dryland environment contributes fine dust through the dry months, and the surface that shows it most is the leading edge of the blades. On the other hand, the absence of salt input lengthens the sensible interval between cleans compared with a coastal site.

Heat is the scheduling constraint: in high summer the usable window of the day shortens and early scheduling works better.

Where we work

We cover wind farms across Badajoz and Cáceres. The crew travels from Mairena del Aljarafe (Sevilla) with all technical resources: water, pressure equipment, compressors and degreasers.

Mobilisation and demobilisation are included from 4 turbines per campaign. If you manage several sites in the region, grouping them into a single campaign is what brings the cost down most.

RPAS pilots preparing the cleaning drone before the flight
Duration
1 working day per turbine
Personnel at height
None
Minimum order
4 turbines per campaign
Activation from order
~3 weeks
Maximum nacelle height
100 m
Aviation permits and liability cover
Included
Deliverable
Before and after photographic evidence, per machine

Request a quote

Services available

Tower

The complete shaft, with nobody abseiling down it.

Nacelle

The outer housing, with nobody accessing it.

Frequently asked questions

Do you operate across Extremadura?

Yes. We cover Badajoz and Cáceres. Crew mobilisation is included from 4 turbines per campaign.

How soon can you start?

Around 3 weeks from confirmed order, which is what the aviation filing takes. At sites with no aviation constraints it can be considerably less.

What do you need from the site on the day?

The turbine held in maintenance position, with yaw and pitch controlled by the site, and preventive sealing of the nacelle. Everything else is ours.

Tell us about your site and we will send you a quote

Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.