Wind turbine cleaning in Castile and León

Full, blade, tower and nacelle cleaning with ground operated drones, at wind farms across Castile and León. One working day per machine, with nobody at height.

What drives a campaign in Castile and León

Castile and León holds a large share of Spain’s older wind fleet, and that changes the job: on machines that have gone years without an intervention, the first clean is recovery rather than maintenance. It shows up in flight time and product consumption, which is why it pays to look at the real condition of the machines before fixing the scope of a campaign.

The dominant soiling here is agricultural: tillage and harvest dust, which binds differently depending on site humidity. It builds up mainly on the leading edge of the blades and on the upper section of the tower.

Winter is the other variable. Frost and low temperatures affect how the product behaves on the surface, so campaigns work better between spring and autumn. That is an operational preference rather than a limitation: the date is always confirmed the week before, based on the forecast.

Where we work

We cover wind farms across Burgos, Soria, Palencia, Valladolid, Zamora, León, Salamanca, Ávila and Segovia. The crew travels from Mairena del Aljarafe (Sevilla) with all technical resources: water, pressure equipment, compressors and degreasers.

Mobilisation and demobilisation are included from 4 turbines per campaign. If you manage several sites in the region, grouping them into a single campaign is what brings the cost down most.

Clean wind turbine tower at a wind farm in Castile and León
Duration
1 working day per turbine
Personnel at height
None
Minimum order
4 turbines per campaign
Activation from order
~3 weeks
Maximum nacelle height
100 m
Aviation permits and liability cover
Included
Deliverable
Before and after photographic evidence, per machine

Request a quote

Services available

Tower

The complete shaft, with nobody abseiling down it.

Nacelle

The outer housing, with nobody accessing it.

Frequently asked questions

Do you operate across Castile and León?

Yes. We cover Burgos, Soria, Palencia, Valladolid, Zamora, León, Salamanca, Ávila and Segovia. Crew mobilisation is included from 4 turbines per campaign.

How soon can you start?

Around 3 weeks from confirmed order, which is what the aviation filing takes. At sites with no aviation constraints it can be considerably less.

What do you need from the site on the day?

The turbine held in maintenance position, with yaw and pitch controlled by the site, and preventive sealing of the nacelle. Everything else is ours.

Tell us about your site and we will send you a quote

Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.