Wind turbine cleaning in Galicia

Full, blade, tower and nacelle cleaning with ground operated drones, at wind farms across Galicia. One working day per machine, with nobody at height.

What drives a campaign in Galicia

Galicia is coastal and upland country, and both matter. Proximity to the sea means salt deposits, the most aggressive kind of soiling and the one that shortens the interval between cleans the most. At sites a few kilometres from the coast, a sensible cadence is shorter than inland.

Constant humidity also changes how soiling binds: instead of loose dust you get adhered deposits and biological growth on the surfaces least exposed to the sun, particularly the lower tower and the north face of the nacelle.

Weather is the dominant variable. Working windows are shorter and less predictable than on the inland plateau, so in Galicia we plan with more margin and confirm the date with the forecast in hand. It is the same constraint any work at height faces in this region; the drone does not introduce it.

Where we work

We cover wind farms across A Coruña, Lugo, Ourense and Pontevedra. The crew travels from Mairena del Aljarafe (Sevilla) with all technical resources: water, pressure equipment, compressors and degreasers.

Mobilisation and demobilisation are included from 4 turbines per campaign. If you manage several sites in the region, grouping them into a single campaign is what brings the cost down most.

Drone cleaning a wind turbine blade with pressurised water
Duration
1 working day per turbine
Personnel at height
None
Minimum order
4 turbines per campaign
Activation from order
~3 weeks
Maximum nacelle height
100 m
Aviation permits and liability cover
Included
Deliverable
Before and after photographic evidence, per machine

Request a quote

Services available

Tower

The complete shaft, with nobody abseiling down it.

Nacelle

The outer housing, with nobody accessing it.

Frequently asked questions

Do you operate across Galicia?

Yes. We cover A Coruña, Lugo, Ourense and Pontevedra. Crew mobilisation is included from 4 turbines per campaign.

How soon can you start?

Around 3 weeks from confirmed order, which is what the aviation filing takes. At sites with no aviation constraints it can be considerably less.

What do you need from the site on the day?

The turbine held in maintenance position, with yaw and pitch controlled by the site, and preventive sealing of the nacelle. Everything else is ours.

Tell us about your site and we will send you a quote

Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.