Full turbine cleaning
Blades, hub, tower and nacelle in a single intervention.
Full, blade, tower and nacelle cleaning with ground operated drones, at wind farms across Aragón. One working day per machine, with nobody at height.
The cierzo defines operations in the Ebro valley. It is a strong, dry, persistent wind, and it drives both campaign scheduling and the soiling itself: it carries dust and deposits it very distinctly on one particular face of the machine.
For drone work that means two things. First, the weather window needs more careful handling than in other regions. Second, wear is not uniform: it pays to inspect before fixing the scope, because the work often concentrates on one part of the machine and the full scope is not needed.
Aragón also has wind farms at altitude in Teruel and the Pre-Pyrenees, where winter shortens the usable working season.
We cover wind farms across Zaragoza, Huesca and Teruel. The crew travels from Mairena del Aljarafe (Sevilla) with all technical resources: water, pressure equipment, compressors and degreasers.
Mobilisation and demobilisation are included from 4 turbines per campaign. If you manage several sites in the region, grouping them into a single campaign is what brings the cost down most.
Blades, hub, tower and nacelle in a single intervention.
The most exposed surface, cleaned from the ground.
The complete shaft, with nobody abseiling down it.
The outer housing, with nobody accessing it.
Photographic reporting per machine, to prioritise.
The full comparison, including what the drone does not solve.
Yes. We cover Zaragoza, Huesca and Teruel. Crew mobilisation is included from 4 turbines per campaign.
Around 3 weeks from confirmed order, which is what the aviation filing takes. At sites with no aviation constraints it can be considerably less.
The turbine held in maintenance position, with yaw and pitch controlled by the site, and preventive sealing of the nacelle. Everything else is ours.
Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.