Full turbine cleaning
Blades, hub, tower and nacelle in a single intervention.
Full, blade, tower and nacelle cleaning with ground operated drones, at wind farms across Catalonia. One working day per machine, with nobody at height.
Catalan wind farms split between the inland ranges of Tarragona and Lleida and sites closer to the Mediterranean. That dual situation produces two different soiling patterns within the same region: dust and plant matter inland, salt input near the coast.
Airspace density along the Mediterranean corridor is the operational particularity to account for. At sites with aviation constraints, filing with the Spanish aviation authority can take longer than average, and it is worth starting it well ahead of the planned outage window.
Handling those permits is on us, not on the site. What we do ask for is enough notice that the lead time does not become the problem.
We cover wind farms across Tarragona, Lleida, Barcelona and Girona. The crew travels from Mairena del Aljarafe (Sevilla) with all technical resources: water, pressure equipment, compressors and degreasers.
Mobilisation and demobilisation are included from 4 turbines per campaign. If you manage several sites in the region, grouping them into a single campaign is what brings the cost down most.
Blades, hub, tower and nacelle in a single intervention.
The most exposed surface, cleaned from the ground.
The complete shaft, with nobody abseiling down it.
The outer housing, with nobody accessing it.
Photographic reporting per machine, to prioritise.
The full comparison, including what the drone does not solve.
Yes. We cover Tarragona, Lleida, Barcelona and Girona. Crew mobilisation is included from 4 turbines per campaign.
Around 3 weeks from confirmed order, which is what the aviation filing takes. At sites with no aviation constraints it can be considerably less.
The turbine held in maintenance position, with yaw and pitch controlled by the site, and preventive sealing of the nacelle. Everything else is ours.
Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.