Wind turbine cleaning in Castilla-La Mancha

Full, blade, tower and nacelle cleaning with ground operated drones, at wind farms across Castilla-La Mancha. One working day per machine, with nobody at height.

What drives a campaign in Castilla-La Mancha

Wind farms here tend to sit on open, highly exposed terrain with long dry summers. The soiling that builds up is mostly fine dust and insect residue, concentrated on the leading edge of the blade through the hot season.

Road access in this region is usually good, which keeps mobilisation cheap: getting the crew, the water tank and the compressor to the base of the machine is rarely the bottleneck. On sites like these, one working day per turbine is comfortably met.

The variable to watch here is summer heat, not cold. In July and August the operation is better scheduled early, and the usable working window of the day gets shorter.

Where we work

We cover wind farms across Albacete, Cuenca, Ciudad Real, Toledo and Guadalajara. The crew travels from Mairena del Aljarafe (Sevilla) with all technical resources: water, pressure equipment, compressors and degreasers.

Mobilisation and demobilisation are included from 4 turbines per campaign. If you manage several sites in the region, grouping them into a single campaign is what brings the cost down most.

Wind turbine cleaning drone in flight over Castilla-La Mancha
Duration
1 working day per turbine
Personnel at height
None
Minimum order
4 turbines per campaign
Activation from order
~3 weeks
Maximum nacelle height
100 m
Aviation permits and liability cover
Included
Deliverable
Before and after photographic evidence, per machine

Request a quote

Services available

Tower

The complete shaft, with no scaffolding or platform.

Nacelle

The outer housing, with nobody accessing it.

Frequently asked questions

Do you operate across Castilla-La Mancha?

Yes. We cover Albacete, Cuenca, Ciudad Real, Toledo and Guadalajara. Crew mobilisation is included from 4 turbines per campaign.

How soon can you start?

Around 3 weeks from confirmed order, which is what the aviation filing takes. At sites with no aviation constraints it can be considerably less.

What do you need from the site on the day?

The turbine held in maintenance position, with yaw and pitch controlled by the site, and preventive sealing of the nacelle. Everything else is ours.

Tell us about your site and we will send you a quote

Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.