Full turbine cleaning
Blades, hub, tower and nacelle in a single intervention.
Full, blade, tower and nacelle cleaning with ground operated drones, at wind farms across Castilla-La Mancha. One working day per machine, with nobody at height.
Wind farms here tend to sit on open, highly exposed terrain with long dry summers. The soiling that builds up is mostly fine dust and insect residue, concentrated on the leading edge of the blade through the hot season.
Road access in this region is usually good, which keeps mobilisation cheap: getting the crew, the water tank and the compressor to the base of the machine is rarely the bottleneck. On sites like these, one working day per turbine is comfortably met.
The variable to watch here is summer heat, not cold. In July and August the operation is better scheduled early, and the usable working window of the day gets shorter.
We cover wind farms across Albacete, Cuenca, Ciudad Real, Toledo and Guadalajara. The crew travels from Mairena del Aljarafe (Sevilla) with all technical resources: water, pressure equipment, compressors and degreasers.
Mobilisation and demobilisation are included from 4 turbines per campaign. If you manage several sites in the region, grouping them into a single campaign is what brings the cost down most.
Blades, hub, tower and nacelle in a single intervention.
The most exposed surface, cleaned from the ground.
The complete shaft, with nobody abseiling down it.
The outer housing, with nobody accessing it.
Photographic reporting per machine, to prioritise.
The full comparison, including what the drone does not solve.
Yes. We cover Albacete, Cuenca, Ciudad Real, Toledo and Guadalajara. Crew mobilisation is included from 4 turbines per campaign.
Around 3 weeks from confirmed order, which is what the aviation filing takes. At sites with no aviation constraints it can be considerably less.
The turbine held in maintenance position, with yaw and pitch controlled by the site, and preventive sealing of the nacelle. Everything else is ours.
Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.