Full turbine cleaning
Blades, hub, tower and nacelle in a single intervention.
Full, blade, tower and nacelle cleaning with ground operated drones, at wind farms across Navarre. One working day per machine, with nobody at height.
Navarre was one of the first regions in Spain to develop wind, so there are sites here with many operating years behind them and machines that have never had a proper clean.
On that kind of fleet, a prior inspection stops being an extra and becomes the sensible way to start: photographic reporting per machine shows where the soiling actually is and whether the full scope is needed or blades and tower are enough.
The climate combines Atlantic influence in the north of the region with a drier character in the Ribera, with the cierzo coming in from the south. Working conditions change considerably from one end of Navarre to the other.
We cover wind farms across Chartered Community of Navarre. The crew travels from Mairena del Aljarafe (Sevilla) with all technical resources: water, pressure equipment, compressors and degreasers.
Mobilisation and demobilisation are included from 4 turbines per campaign. If you manage several sites in the region, grouping them into a single campaign is what brings the cost down most.
Blades, hub, tower and nacelle in a single intervention.
The most exposed surface, cleaned from the ground.
The complete shaft, with nobody abseiling down it.
The outer housing, with nobody accessing it.
Photographic reporting per machine, to prioritise.
The full comparison, including what the drone does not solve.
Yes. We cover Chartered Community of Navarre. Crew mobilisation is included from 4 turbines per campaign.
Around 3 weeks from confirmed order, which is what the aviation filing takes. At sites with no aviation constraints it can be considerably less.
The turbine held in maintenance position, with yaw and pitch controlled by the site, and preventive sealing of the nacelle. Everything else is ours.
Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.