Wind turbine cleaning in Valencian Community

Full, blade, tower and nacelle cleaning with ground operated drones, at wind farms across Valencian Community. One working day per machine, with nobody at height.

What drives a campaign in Valencian Community

Valencian wind is concentrated mainly inland in Castellón and Valencia, on ranges well away from the coast despite the region being Mediterranean. That reduces salt input compared with what you might expect and leaves dust as the dominant soiling.

The operational particularity is the Mediterranean corridor airspace, dense and with several airports. At constrained sites, aviation filing can run beyond the three week average, and that has to go into the calendar from the start.

The usable season is long: mild winters allow work through much of the year, with summer the only stretch to avoid because of heat.

Where we work

We cover wind farms across Castellón, Valencia and Alicante. The crew travels from Mairena del Aljarafe (Sevilla) with all technical resources: water, pressure equipment, compressors and degreasers.

Mobilisation and demobilisation are included from 4 turbines per campaign. If you manage several sites in the region, grouping them into a single campaign is what brings the cost down most.

Cleaning drone alongside a wind turbine tower shaft
Duration
1 working day per turbine
Personnel at height
None
Minimum order
4 turbines per campaign
Activation from order
~3 weeks
Maximum nacelle height
100 m
Aviation permits and liability cover
Included
Deliverable
Before and after photographic evidence, per machine

Request a quote

Services available

Tower

The complete shaft, with nobody abseiling down it.

Nacelle

The outer housing, with nobody accessing it.

Frequently asked questions

Do you operate across Valencian Community?

Yes. We cover Castellón, Valencia and Alicante. Crew mobilisation is included from 4 turbines per campaign.

How soon can you start?

Around 3 weeks from confirmed order, which is what the aviation filing takes. At sites with no aviation constraints it can be considerably less.

What do you need from the site on the day?

The turbine held in maintenance position, with yaw and pitch controlled by the site, and preventive sealing of the nacelle. Everything else is ours.

Tell us about your site and we will send you a quote

Three data points are enough: number of turbines, location and rotor diameter. We come back with a fixed price per machine and scope within two working days.